![]() |
![]() |
![]() |
||||
|
|
||||||
|
||||
Building Committee This committee of five was chosen to coordinate all design and construction efforts with the architects. Architect Selected by the Steering Committee in the summer of 2001, the architects have been instrumental in conducting the Needs Assessment and Utilization Study for FPC, as well as developing the Master Plan. General Contractor |
||||
|
||||